bridge TR-TQ
client: Geva Vastgoed
location: Eindhoven
realisation: 2018
program: Eindhoven
photography: Tycho Merijn
The existing structure that stood in front of the TR building is moved to the rear and forms the new connection between building TQ and TR. Here a new deck with balustrade is realized on top, which is provided with flower boxes between the paths.